|
||||||||||||||||||||||||||||||||||||||||
| Project List | |
|
Homestead Legislation for West Virginia Post-Mining Sites. 2000. Team Member of team including attorneys, mining engineers, civil engineer, planner, biologist, soils scientist, and landscape architect. Responsibilities: Part of team assembled to write legislation for Homesteading on land previously mined for coal. The team's recommendations included homesteader requirements, municipal infrastructure, natural systems reconstruction,park and open space requirements and configuration, forestry requirements, lot configuration, materials, and plansubmittal requirements. Wes Davis Greenway Plan. Bristol, Tennessee. 2001. Designer. Responsibilities: Strategic Plan for Wes Davis Greenway, including master plan, planting design, and maintanence. Cadwalader Park. Trenton,
New Jersey. 2001. Consultant to March Associates, Inc. Responsibilities:
Reviewer and contributor to Master Planting Plan for restoration of park
designed by Frederick Law Olmsted, Sr. SWA GROUP Mills Branch Park, Kingwood,
Texas.1992. Project Manager/Designer. Responsibilities: Project design,
construction drawings, and construction observation for a 2.5 acre neighborhood
park. Copper Lakes. Houston,
Texas.1992. Design Team Member. Responsibilities: As part of a single-family
residential development, our work includes development of the open space
plan, master plan and detail design of the community center park. Our
most important task is to reconfigure/redesign a major drainage corridor
into an environmentally-positive structure, which necessitates the change
of obsolete laws and engineering practices. Work includes construction
drawings and construction observation. Green Meadows. Johnston,
Iowa.1992. Landscape Designer/Planning Team Member. Responsibilities:
My role is to develop an open space plan for a new community. The proposed
solution utilizes principles of landscape ecological principles and is
planned as a sustainable landscape. Kingwood South. Kingwood,
Texas.1992. Design Team Member. Responsibilities: Assist in land planning
for a new community, including neighborhood form and type development;
location of schools, churches, libraries, retail; design of open space
network (wetlands protection, trail systems, parks); road layout and lotting. Longwood. Houston, Texas.1992.
Design Team Member. Responsibilities: Assist in land planning for new
community. Detention Park. Clear
Lake City, Texas.1992. Designer. Responsibilities: Design of parking,
entry, planting, and lookout point for Detention Park. Northfork Greenbelt. Clear
Lake City, Texas.1992. Project Landscape Architect. Responsibilities:
Design and construction drawings for trails, planting and drainage. OFFICE OF JAMES BURNETT United Medical Center.
Moline, Illinois.1991-92. Design Team Member. Responsibilities: Working
with the architects, we formulated a Master Plan for a complex of medical
buildings. Univ. of Texas Medical
Campus. Galveston, Texas.1991. Design Team Member. Responsibilities: Landscape
design for "Campus Mall" including street reconfiguration, existing
and future building locations and uses, walks, fountains, and planting
design. Braun Residence. Houston,
Texas.1991-92. Project Landscape Architect. Responsibilities: Redesign
of residential grounds (1/4 acre lot), including courtyard, which was
conceived of as a Floating Plane to unite the what was a discreet space
with the larger garden.
Brae Burn Country Club
Pool. Newton, Massachusetts.1990. Designer. Responsibilities: Design of
pool area, including reconfiguration of pool, new deck, a children's play
area, and design of children's "grotto". Bernon Residence. Wellesley,
Massachusetts.1990. Design Team Member. Responsibilities: Design and construction
drawings for 30 acre grounds, including grading, planting, walls, steps
and terraces. My particular concentrated areas were the terraces and the
pool area.
Town Plan, "Kentlands".
Gaithersburg, Virginia.1988. Charrette Participant in interdisciplinary
team. Responsibilities: Development of "open space" areas.
Winston-Salem Health Care.
Winston-Salem, North Carolina. 1985. Project Landscape Architect. Responsibilities:
Design and construction drawings for entry plaza, planting, parking and
median development. Greenville Business Park.
Greenville, South Carolina. 1985. Design Team Member. Responsibilities:
Master plan for new business park, including office-retail, office-distribution
and warehouse facilities. Winston-Salem Business
Park. Winston-Salem, North Carolina. 1985. Project Designer. Responsibilities:
Master plan for new business park, including office-retail, office-distribution
and warehouse facilities. Laura Duncan Farm. Raleigh,
North Carolina. 1985. Project Designer. Responsibilities: Master plan
for retail, office, industrial, and multi-family uses. Duke Power Central Maintenance
Facility. Charlotte, North Carolina. 1986. Project Landscape Architect.
Responsibilities: Design for central maintenance facility andvisitors
center. The challenge was to accommodate both the "untidy" line
trucks, etc. while presenting a facility that exemplified the best of
Duke Power for its visitors. American Schlafhorst.
Charlotte, North Carolina. 1986. Design Team Member. Responsibilities:
Master Plan for new American headquarters plus sites for speculative development. Shriners Children's Hospital.
Greenville, South Carolina. 1986-87. Project Landscape Architect. Responsibilities:
Design and construction drawings for a 10 acre facility, including terraces,
entry court and larger site. Barrington Park. Greenville, South Carolina. 1986-87. Project Landscape Architect. Responsibilities: Design and construction drawings for subdivision, including design for central facility, lots, 1800 linear feet of road, and entry planting. I acted as project manager, coordinating civil, municipal approvals and field management.
|
| Copyright Kathy Poole 2000 all rights reserved, subject to all fair use regulations, not to be reproduced or used without expressed written permission. |