North Point High School. Fulton County, Georgia. 2002-2003. Landscape Architect.
Architect: Nathan Kirkman, Perkins + Will. Sustainability Consultant: Richard Price, McGuffey Hill, LLC. Civil Engineers: Travis Pruitt.
Responsibilities: Design development and construction drawings for landscape architecture (excluding sports fields): Courtyards, Entries, Bioretention Landscapes.

Walden Farm. Rappahannock County, Virginia. 2002. Designer.
Responsibilities: Make a working farm into a restorative weekend retreat while maintainging it as a working farm and making it a sustainable, ecologically-healthy landscape.

Green Summit. Kingsport, Tennessee. 2001. Summit Leader.
Responsibilities: Work with civic leaders to identify important issues regarding the city's landscape, present them to interested citizens, and have citizens prioritize them so that the city can act accordingly.

Wes Davis Greenway Plan. Bristol, Tennessee. 2001. Designer.
Responsibilities: Strategic Plan for Wes Davis Greenway, including master plan, planting design, and maintenance.

Chapel Residence. Charlottesville, VA 2001. Designer.

Responsibilities: Design of garden with focus on new brick and bluestone terrace adjacent to house and to bluestone terraces within the garden.

Cadwalader Park. Trenton, New Jersey. 2001. Consultant.
Consultant to March Associates, Inc. Responsibilities: Reviewer and contributor to Master Planting Plan for restoration of park designed by Frederick Law Olmsted, Sr.

Bristol Downtown Plan. Bristol, Virginia/Tennessee. 1999-2001. Designer.
Responsibilities: Urban design strategy for downtown; conceptual design of network of connections to surrounding area and region; design development of street landscapes; conceptual ideas for redevelopment of Beaver Creek; conceptual design of series of public landscapes within the downtown plan.

Bristol Transit Market.Bristol, Tennessee. 2000. Designer.

Responsibilities: Design for Farmer’s Market and Plaza Landscape; design development; construction drawings; on-site design implementation.

Homestead Legislation for West Virginia Post-Mining Sites. 2000. Team Member of working group including attorneys, mining engineers, civil engineer, planner, biologist, soils scientist, and landscape architect.
Responsibilities: Part of team assembled to write legislation for Homesteading on land previously mined for coal. The team's recommendations included homesteader requirements, municipal infrastructure, natural systems reconstruction,park and open space requirements and configuration, forestry requirements, lot configuration, materials, and plan submittal requirements.

Easterling Garden. 1999. Charlottesville, Virginia. Designer.

Responsibilities: design of garden; installation of paving and planting. Collaboration with John Easterling on design of pavilion that doubles as play structure, John Easterling, primary designer and builder.

Redevelopment Plan for Cap Haitien, Haiti. 1998. Team Member.

Part of multidisciplinary design team sponsored by the Organization for American States. Responsibilities: develop a strategic plan for revitalizing the town through the development of a tourism plan. My specific role (as I defined it) was to develop a park infrastructure that provided the armature for two things: 1) a sewage and storm drainage plan; and 2) a processional sequence for a series of tours through the historic town.

Mayry Residence. Charlottesville, Virginia. 1998. Designer.
Responsibilities: Design for terrace and garden for residential garden and yoga training studio.

Monticello High School. Albemarle County, Virginia. 1995. Consultant.
Consultant to William McDonough + Partners. Responsibilities: site studies, schematic landscape design plan, consultant on natural systems.

Carlson-Abbey Residence. Houston, Texas.1992. Designer.
Responsibilities: Design and construction documents for suburban garden that challenged traditional norms by placing the vegetable garden in the front of the house. The garden is about patience and small victories. It had to be inexpensive and simple enough for the owners to install it themselves.

Morian Residence. Houston, Texas.1992. Designer.

Responsibilities: Design and construction drawings for residential garden whose primary focus is a water garden. It is a garden for both singular solitude and social gathering. The garden is formed by a pavilion, fountain and planted runnel which provide a backbone to the space, a necessity given the owner's love of plant experimentation and variety.

Mills Branch Park, Kingwood, Texas.1993. Project Manager/Designer.
Responsibilities: Project design, construction drawings, and construction observation for a 2.5 acre neighborhood park. Kathy Poole with the SWA Group, Inc., Kevin Shanley, Project Director.

Eurosud, Calvisson, France. 1993. Design Team Member.
Responsibilities: Team member in developing speculative office/hotel conference development that preserved the landscape sensibility of this historic and culturally significant garrigue landscape of agricultural fields and former olive groves. Kathy Poole with the SWA Group, Inc., Ed Kagi, Project Director.

Copper Lakes. Houston, Texas.1993. Design Team Member/Project Landscape Architect.
Responsibilities: As part of a single-family residential development, our work includes development of the open space plan, master plan and detail design of the community center park. Our most important task is to reconfigure/redesign a major drainage corridor into an environmentally-positive structure, which necessitates the change of obsolete laws and engineering practices. Work includes construction drawings and construction observation.Kathy Poole with the SWA Group, Inc., John Cutler, Project Manager, Kevin Shanley, Project Director.

Houston Country Club Tennis Complex Master Plan. Houston, Texas. 1992. Project Landscape Architect.

Responsibilities: Develop master plan that included recommendations for the pedestrian entry at the parking, configuration of pedestrian pavements adjacent to the tennis pro shop, proposed rest areas and patios, interface with pool fencing, and screening of pool equipment and service area. Accompanying the plan is a schematic design of areas, a phasing plan, and a preliminary cost estimate. Kathy Poole at the SWA Group, Inc. John Cutler, project director.

Green Meadows. Johnston, Iowa.1992. Landscape Designer/Planning Team Member.
Responsibilities: My role was to develop an open space plan for a new community. The proposed solution utilizes principles of landscape ecological principles and is planned as a sustainable landscape. Kathy Poole with the SWA Group, Inc., Ed Kagi, Project Director.

Kingwood South. Kingwood, Texas.1992. Design Team Member.

Responsibilities: Assist in land planning for a new community, including neighborhood form and type development; location of schools, churches, libraries, retail; design of open space network (wetlands protection, trail systems, parks); road layout and lotting.Kathy Poole with the SWA Group, Inc., Kevin Shanley, Project Director.

Longwood. Houston, Texas.1992. Design Team Member.
Responsibilities: Assist in land planning for new community. Kathy Poole with the SWA Group, Inc., Kevin Shanley, Project Director.

Hughes Tool Company. The Woodlands, Texas.1992. Designer.

Responsibilities: Design of entry garden to new corporate headquarters.Kathy Poole with the SWA Group, Inc., John Cutler, Project Director.

Detention Park. Clear Lake City, Texas.1992. Designer.

Responsibilities: Design of parking, entry, planting, and lookout point for Detention Park.Kathy Poole with the SWA Group, Inc., Kevin Shanley, Project Director.

Northfork Greenbelt. Clear Lake City, Texas.1992. Project Landscape Architect.
Responsibilities: Design and construction drawings for trails, planting and drainage. Kathy Poole with the SWA Group, Inc., Kevin Shanley, Project Director.

Mills Branch Drive Conceptual Plan Summary. Kingwood, Texas. 1992. Designer.

Responsibilities: Identify and define opportunities for landscape improvements and neighborhood identity along the Mills Branch Drive corridor. The plan considered planting, Kingwood community identification, neighborhood identification, individual development identification, circulation, integration and improvement of drainageway intersections.
Kathy Poole with the SWA Group, Inc., John Cutler and Kevin Shanley, Project Directors.

Brookwood Greenbelt and Nature Park. Clear Lake City, Texas.1992. Project Landscape Architect.
Responsibilities: Design and construction drawings for trails, seating and planting. Kathy Poole with the SWA Group, Inc., John Cutler, Project Director.

Elvington Garden. Houston, Texas. 1992. Design Team Member.
Responsibilities: Development of Japanese style garden. Kathy Poole at the Office of James Burnett. James Burnett, Project Director.

St. Michael Hospital. Texarkana, Texas. 1992. Design Team Member.
Responsibilities: Master Plan for medical complex that included a four level hospital, an intensive care unit, a four level bed tower, three parking garages, a physicians office, a daycare center, a fitness center, and a specialty hospital. With Watkins Carter Hamilton, Architects.

United Medical Center. Moline, Illinois.1991-92. Design Team Member.

Responsibilities: Working with the architects, we formulated a Master Plan for a complex of medical buildings. Kathy Poole at the Office of James Burnett. James Burnett, Project Director, with Watkins Carter Hamilton, Architects.

Braun Garden. Houston, Texas. 1991-92. Project Landscape Architect.

Responsibilities: Redesign of residential grounds (1/4 acre lot), including courtyard, which was conceived of as a Floating Plane to unite the what was a discreet space with the larger garden.Kathy Poole at the Office of James Burnett.

Univ. of Texas Medical Campus. Galveston, Texas.1991. Design Team Member.
Responsibilities: Landscape design for "Campus Mall" including street reconfiguration, existing and future building locations and uses, walks, fountains, and planting design.

Private Garden. Houston, Texas. 1991. Design Team Member.
Responsibilities: Landscape development of garden design, 18’ x 80’.

IBM Hannover. Hannover, Germany.1990. Design Team Member.
Responsibilities: Development of landscape master plan for an existing facility that is being renovated to become a major community relations and training office. Kathy Poole at Morgan Wheelock, Inc. Morgan Wheelock, Project Director.

Brae Burn Country Club Pool. Newton, Massachusetts.1990. Designer.

Responsibilities: Design of pool area, including reconfiguration of pool, new deck, a children's play area, and design of children's "grotto". Kathy Poole at Morgan Wheelock, Inc.

Bernon Residence. Wellesley, Massachusetts.1990. Design Team Member.
Responsibilities: Design and construction drawings for 30 acre grounds, including grading, planting, walls, steps and terraces. My particular concentrated areas were the terraces and the pool area. Kathy Poole, team member at Morgan Wheelock, Inc. Keith LeBlanc, Project Director.

Town Plan, "Kentlands". Gaithersburg, Virginia.1988. Charrette Participant in interdisciplinary team with Duany/Plater-Zyberk Associates, Town Planners.
Responsibilities: Development of "open space" areas including historic core and wetland areas.

Low Maintenance Landscapes for the Middle East. 1988-89.
Responsibilities: Illustrator and secondary author of a primer for planting design principles in Middle Eastern landscapes. Dr. Jean Marie Hartman, project leader and primary author. Aga Khan Unit for Housing and Development, Harvard University, Cambridge, Massachusetts.

Preparation of Public Enquiry Documents for various projects. Summer 1987. Derek Lovejoy & Associates, London, England


Shriners Children's Hospital. Greenville, South Carolina. 1986-87. Project Landscape Architect.

Responsibilities: Design and construction drawings for a 10 acre facility, including terraces, entry court and larger site. Kathy Poole at Odell Associates, Inc.

Barrington Park. Greenville, South Carolina. 1986-87. Project Landscape Architect.
Responsibilities: Design and construction drawings for subdivision, including design for central facility, lots, 1800 linear feet of road, and entry planting. I acted as project manager, coordinating civil, municipal approvals and field management. Kathy Poole at Odell Associates, Inc. Michael S. Cole, Project Director.

Duke Power Central Maintenance Facility. Charlotte, North Carolina. 1986. Project Landscape Architect.

Responsibilities: Design for central maintenance facility and visitors center. The challenge was to accommodate both the "untidy" line trucks, etc. while presenting a facility that exemplified the best of Duke Power for its visitors.Kathy Poole at Odell Associates, Inc.

North Mecklenburg Multi-Family Housing. Charlotte, North Carolina. 1986. Project Landscape Architect.
Responsibilities: Master plan and approval for multi-family development. Kathy Poole at Odell Associates, Inc. Michael S. Cole, Project Director.

American Schlafhorst. Charlotte, North Carolina. 1986. Design Team Member.
Responsibilities: Master Plan for new American headquarters plus sites for speculative development.

Winston-Salem Health Care. Winston-Salem, North Carolina. 1985. Project Landscape Architect.

Responsibilities: Design and construction drawings for entry plaza, planting, parking and median development.Kathy Poole at Odell Associates, Inc. Michael S. Cole, Project Director.

Greenville Business Park. Greenville, South Carolina. 1985. Design Team Member.

Responsibilities: Master plan for new business park, including office-retail, office-distribution and warehouse facilities.Kathy Poole at Odell Associates, Inc. Michael S. Cole, Project Director.

Winston-Salem Business Park. Winston-Salem, North Carolina. 1985. Project Designer.
Responsibilities: Master plan for new business park, including office-retail, office-distribution and warehouse facilities.Kathy Poole at Odell Associates, Inc. Michael S. Cole, Project Director.

Laura Duncan Farm. Raleigh, North Carolina. 1985. Project Designer.
Responsibilities: Master plan for retail, office, industrial, and multi-family uses. Kathy Poole at Odell Associates, Inc. Michael S. Cole, Project Director.

 