It
has been planned for the Fens to be dredged from Gatehouse 1 to Ipswich
Street. My project is based on this dredging. I have started with a basic
engineering plan as a point of departure. Then I have modified and adapted
this basic plan in order to design the dredging process so that dredging
becomes more than an unwelcome imposed act of engineering. Dredging is incorporated
as part of the design for the future park. The process of dredging and its
products become a new layer within the multi-layered history of the Fens.
My project allows the act of dredging to be seen as the construction process
for the future park.
|