Leigh Fitts
It has been planned
for the Fens to be dredged from Gatehouse 1 to Ipswich Street. My
project is based on this dredging. I have started with a basic engineering
plan as a point of departure. Then I have modified and adapted this
basic plan in order to design the dredging process so that dredging
becomes more than an unwelcome imposed act of engineering. Dredging
is incorporated as part of the design for the future park. The process
of dredging and its products become a new layer within the multi-layered
history of the Fens. My project allows the act of dredging to be
seen as the construction process for the future park.
|
|
|