             Leigh Fitts 
            It has been planned 
              for the Fens to be dredged from Gatehouse 1 to Ipswich Street. My 
              project is based on this dredging. I have started with a basic engineering 
              plan as a point of departure. Then I have modified and adapted this 
              basic plan in order to design the dredging process so that dredging 
              becomes more than an unwelcome imposed act of engineering. Dredging 
              is incorporated as part of the design for the future park. The process 
              of dredging and its products become a new layer within the multi-layered 
              history of the Fens. My project allows the act of dredging to be 
              seen as the construction process for the future park.  
             | 
         
       
     | 
     
      
       |